Some photos of construction taken during today’s site meetings.

The view everyone is going to get from the public areas which go right above these two rooms. That’s Mt. Washington in the distance.
All the downstairs rooms now visible – the building will be backfilled to the level of the black waterproofing.

Downstairs walls are getting cross braced for the next pour.

Lower hallway and pilaster supports for the glu-lam beams.

Just a few of the service knockouts and wirings in walls.