Construction Update 10.02.16

Tongue and Groove Douglas Fir is now being mounted on the concrete haunches and glu-lam beams, we’ll have a roof very soon!

Start of roof

_BCK8199-1

This wood will be exposed on the inside of the building and will contribute to the “wood-first” design elements of the building.

Site Overview 100216

This should be the last look at the building without a roof.

Power soon

Electrical and Mechanical contractors starting to move onto site too.